Gaylord Palms Resort & Convention Center

ORLANDO, FLORIDA
Project Overview
Mason Engineering was awarded the supply of three Fulton Endura EXE-6000 condensing boilers for Gaylord Palms Resort & Convention Center in Orlando, Florida. The project was managed by Compass Engineering.
The boiler package included high-mass, ultra-high-efficiency firetube condensing boilers with duplex stainless-steel heat exchangers, advanced PURE controls, supporting accessories, and three stainless-steel double-wall boiler stacks.
Project at a Glance
|
LOCATION
Orlando, Florida
|
APPLICATION
Hospitality / Convention Center
|
|
PRIMARY EQUIPMENT
3 Fulton Condensing Boilers
|
TECHNOLOGY
Ultra-High-Efficiency Condensing
|
Equipment Supplied
(3) Fulton Endura EXE-6000
Condensing boilers
96.2% AHRI Thermal Efficiency
Duplex stainless-steel heat exchangers |
|
|
Complete Boiler & Venting Solution
Mason Engineering’s scope included the Fulton high-efficiency condensing boiler equipment, advanced controls, accessories, and stainless-steel venting required for an integrated boiler-room solution.
|
