Johns Hopkins All Children’s Hospital


TAMPA, FLORIDA
Project Overview
Mason Engineering supplied a complete boiler package for Johns Hopkins All Children’s Hospital in Tampa, Florida.
The project included two Fulton VTG-6000DF boilers and two Fulton EXE-5000 condensing boilers, along with boiler accessories, sequencing controls, and six Heat-Fab Saf-T Vent CI 316 boiler stacks.
Project at a Glance
|
LOCATION
Tampa, Florida
|
APPLICATION
Healthcare
|
|
PRIMARY EQUIPMENT
4 Fulton Boilers
|
TECHNOLOGY
Condensing Boiler System
|
Equipment Supplied
|
(2) Fulton VTG-6000DF
Boilers
(2) Fulton EXE-5000
Condensing boilers |
|
|
Complete Boiler & Venting Solution
Mason Engineering’s scope included the Fulton boiler equipment, accessories, sequencing controls, and Heat-Fab stainless steel venting required for an integrated boiler-room solution.
|
